U.S. Department of Health and Human Services
Administration for Children & Families
Office of Child Support Enforcement
TCC-00-07
AUG
21, 2000
TO: ALL FEDERAL OFFSET CONTACTS
RE: Processing Year 2001 Certification Process
In preparation for the start of the PY2001 Submittal Process, please respond in writing
to the questions listed below. These questions have been categorized based on the specific
information needed from both annual and continuous submitting States. Please fax your
response to: (202) 401-5553, Attn: Scott Hale, or email to scollections@acf.hhs.gov
no later than August 25, 2000.
For your convenience, the finalized version of the PY2001 Certification Process and
Schedule is enclosed. Please review this process carefully, as modifications have been
made since it's last distribution. The document will serve as final written notice of the
PY2001 Certification Process.
1). Is your State submitting an annual certification file?
2). If OCSE issues Pre-Offset notices for your State, are you requesting that
Pre-Offset notices be sent for all cases or for new cases only?
The remaining questions apply only to those States that are submitting an annual
certification file:
3). For those States that generate their own Pre-Offset notices, what date will be
issued on the Pre-Offset notices?
4). What will be the approximate number of cases in your submittal file?
5). Based on the schedule provided below, what date will your submittal file be sent to
OCSE?
If any changes to the above need to be made following your reply, please notify the
Special Collections Unit immediately via the fax number or email address listed above. For
those States sending an annual certification file, please contact the Special Collections
Unit at (202) 401-9389 before transmitting.
If you have any other questions, please feel free to contact the Special Collections
Unit at
(202) 401-9389 or scollections@acf.hhs.gov.
Sincerely,
Donna J. Bonar
Associate Commissioner
For Office of Automation and Program Operations
Office of Child Support Enforcement
cc: State IV-D Directors
FEDERAL OFFSET, SPECIAL COLLECTIONS UNIT
PY2001 CERTIFICATION PROCESS (FINAL)
It is recommended that all States, whether submitting annually or continuously, update
their Local Code files prior to the start of the PY2001 Certification Process. This will
help to reduce the possibility of receiving rejects as a result of Local Code errors.
ANNUAL SUBMISSION
- Entire certified caseload is submitted by the State. The Transaction Type must be
145A for all cases.
- Cases will be run through a front-end process to determine whether the case is an add
(i.e., new or re-certified case) or a modification to an active case.
- If the case is an add, the transaction type will remain as 145A.
- If its determined that the case is being modified, the front-end process will
create the appropriate transaction(s): Modify amount owed (M), Change submitting State
Local Code (L), or Replace existing offset exclusion indicator(s) (R). If there are
multiple changes to an active case (e.g., arrearage amount and exclusion indicators),
multiple transactions will be created for the same case (e.g., M and R).
- OCSE will compare the States annual submittal file to cases currently certified at
OCSE. If a case is active at OCSE and is not on the submittal file, a Delete (D)
transaction will be generated.
- The OCSE generated transactions will be submitted along with the add transactions into
the weekly update process, where processing will continue as normal.
- Any errors will be returned on the Rejected Case Submission and Update File with the
record that generated the error. For example, the front-end process determines that a case
from the Case Submission and Update File is modifying the arrearage amount for an existing
case, and it generates an 145M transaction for the case. The normal weekly update
process then detects an error for the 145M transaction. The case will be returned
on the Rejected Case Submission and Update File as an 145M transaction with the
related error code, as opposed to being returned as the originally submitted 145A
transaction.
- Please note that FIDM-Only cases will continue to be processed under the same
restrictions as currently apply in the normal weekly update process. Therefore, a case can
not be submitted in the annual submission file with modifications to the exclusion
indicators to change a non-FIDM-Only case to FIDM-Only, or to change a FIDM-Only case to
non-FIDM-Only. Either of these situations will cause the case to be rejected by the weekly
update process with an error code of 39. Such cases should be submitted for Annual
Certification in their current FIDM-Only or non-FIDM-Only state, and be resubmitted after
the Certification Process is complete to change their FIDM-Only status.
- Changes (Updates & Deletes) to active cases will occur at the time the annual
submittal file is processed. OCSE will not wait until 1/1/2001 to implement changes.
- Additional updates (Adds, Modifies, etc.) can not be sent by the State until the reject
file from the annual submittal is received and processed by the State (approximately 2
weeks).
- States must notify OCSE in writing (via fax or email) when they have completed
processing the reject file from the annual submittal. OCSE will not begin reprocessing
weekly update files until this notification has been received.
CONTINUOUS SUBMISSION
- Updates (Adds, Modifies, etc.) will be accepted and processed through 12/11/2000
(Monday).
FREEZE PERIOD
- A freeze period for all submissions, Annual or Continuous, will be in effect from
12/12/2000 through 1/2/2001 to allow for reconciliation.
OCSE GENERATED PRE-OFFSET NOTICES
- For Annual & Continuous submitters, States can choose to have PONs sent for all
cases, or just for new cases.
- For Annual submitters, PONs will be created when the submission file is processed.
- For Continuous submitters, PONs will be created in October if the State requests that
notices be sent for all cases.
- A PON will be sent for any case that has not had a notice sent in the last 45 days.
SCHEDULE
| 9/1/00 - 12/11/00 |
PY2001 Certification Period |
|
Updates accepted and processed for all continuous submitters. Updates accepted and
processed for annual submitters who have not yetsubmitted their annual file, or have
submitted their annual file and received back and processed rejects from their annuaal
submission. |
| 9/1/00 - 9/13/00 |
Annual submission period for 90 day hold period States. |
| 9/25/00 - 10/6/00 |
Annual submission period for 45 or 60 day hold period States. |
| 11/1/00 - 11/15/00 |
Annual submission period for 30 day hold period States. |
| 12/12/00 - 1/2/01 |
Freeze period for all States (Annual and Continuous submitters). |
| 1/3/01 |
Updates accepted from all States. |
| 1/26/01 |
IRS processing electronic refunds. |
| 2/2/01 |
IRS processing paper refunds. |